When You Need Pre-Backfill Sewer Testing
Testing before backfill is needed for new sewer line installations, main line replacements, dig-and-repairs, and new construction or additions that tie into the sewer. Many cities require a passing test before the inspector signs off.
Builders and general contractors call us when they need the test done right the first time to keep a project on schedule.
Our Pre-Backfill Sewer Testing Process
With the line still exposed, we plug the openings and run a water or air test to confirm the line holds without leaking. We also run a camera through the line to check slope and joints.
If anything fails, we fix it while the trench is open. Once the line passes, we document the results for the inspector before backfill.
Pre-Backfill Sewer Testing Cost in Fort Worth
Testing cost depends on the length of the line and the type of test required. When we do the excavation, testing is part of the job. We give you a free estimate up front.
Why Choose Us
We test before we backfill on every job, so problems are caught early. Our licensed plumbers know local inspection requirements.
Pre-backfill testing is part of our excavating contractor services. See our sanitary sewer testing service for testing on existing lines.
Pre-Backfill Sewer Testing FAQs
What kind of test do you use?
Usually a water or air pressure test plus a camera inspection, depending on what the city requires.
Can you test a line another contractor installed?
Yes. We can test it and document the results.
Don't Wait Until It's Too Late
Don't let a small problem turn into a bigger repair. Call Plumb Right Solutions at (682) 286-5436, Monday to Friday, 7 AM to 6 PM, or schedule service online. Estimates are free.